  • THE CHALLENGE

    A major geothermal operator in New Zealand required intervention on a depleted well in Rotorua. The operation involved removing an obstruction at 2,500m, replacing a worn 7-in. shield liner, and cleaning five feed zones. This was originally planned as two separate runs, which would have increased time, cost, and operational risk.

  • THE SOLUTION

    DSI’s global technical team collaborated with the operator to redesign the plan using a 4 ¾-in. PBL® tool, configured with dual 18/32-in. nozzles, enabling milling and jet washing in a single run.

  • EXECUTION

    DSI’s global technical team collaborated with the operator to redesign the plan using a 4 ¾-in. PBL® tool, configured with dual 18/32-in. nozzles, enabling milling and jet washing in a single run.

    • Milling performed at 300 GPM
    • PBL® system activated and verified via pressure response
    • Flow rate increased to 450 GPM for jet cleaning
    • Five feed zones washed from 2,425 to 1,500m
    • Tool deactivated and pulled to surface in excellent condition, no nozzle wear observed
  • RESULTS & BENEFITS

    The deployment of the 4 ¾-in. PBL® Split Flow Bypass Tool proved highly effective in this geothermal intervention, delivering both operational and economic advantages.


    Key Achievements:

    • Eliminated an entire trip: By combining milling and highrate jet washing into a single BHA the Operator avoided a second run, saving both time and cost.
    • Reduced safety exposure: Fewer trips meant less handling of tools and tubulars, lowering the risk of operational incidents and improving onsite HSE performance.
    • Maintained tool integrity at high flow rates: The PBL® tool and its nozzles withstood flows up to 450 GPM without erosion or wear, confirming durability in harsh, abrasive geothermal environments.
    • Enabled efficient debris removal & feed zone cleaning: Split Flow activation allowed targeted jetting across five feed zones, improving wellbore condition and restoring production pathway.
    • Demonstrated geothermal readiness for future wells: This successful operation proves the PBL® system is not only suitable for oil & gas but highly capable in hightemperature, high-flow geothermal applications.

    With this milestone, DSI advances its presence in geothermal drilling applications, offering operators a reliable, field-proven tool for circulation, hole cleaning, and multi-function intervention workflows.

Details


Location

New Zealand

Hole Size

8 ½ in.

total feet

~6000m MD, 28° inclination

benefit

Safe, reliable and effective way to pull out of hole dry