OD PBL® Multiple Activation Bypass System

A group of men wearing hard hats are standing next to each other.

A major oil company in Mexico wanted to run a DSI PBL® Bypass System to pump and displace lost circulation material (LCM) to bridge and plug the highly fractured carbonate formation. This would allow the operator to successfully drill the well to planned TD. The operator worked with the DSI team and determined that a 6¾ inch OD PBL® Multiple Activation Bypass System should be utilized to clean out the well.

By Paullomy Chowdhury November 10, 2025
SBBR SIPAT 2025: A Week Dedicated to Safety, Respect, and Well-being!
By Paullomy Chowdhury November 10, 2025
Milestone achieved in Malaysia!
By Paullomy Chowdhury November 10, 2025
Wrapping up ADIPEC 2025 on a truly positive note!
By Paullomy Chowdhury November 5, 2025
Amazing energy at ADIPEC 2025!
By Paullomy Chowdhury November 5, 2025
Great day connecting with industry leaders at ADIPEC 2025!
By Paullomy Chowdhury November 5, 2025
Day 2 at ADIPEC started on a high note!
More Posts